Seafox 8 2025

WORK DESCRIPTION: 

Post load testing inspection conducted of the cranes. Rope access/ MPI and ECT inspection.   

Type of work: Rope Access/NDT inspection

Period: July/August
Location: Qatar
Platform: Seafox 8