
Subsea installation, ROV/Dive for the recovery and installation of transducers on pile 2012
WORK DESCRIPTION: Subsea installation:
• ROV/Dive for the recovery and installation of transducers on a pile
Please note that this is a selection of our main projects. If you are looking for something more specific, please contact us for more information.

WORK DESCRIPTION: Subsea installation:
• ROV/Dive for the recovery and installation of transducers on a pile

WORK DESCRIPTION: Subsea inspection and repair campaign:
• ROV inspection of the test pile
• ROV cable repair
• ROV recovery of

Subsea inspection and installation campaign:
• ROV installation of core sensor on seabed
• ROV geological survey of seabed

Subsea inspection and installation campaign:
• ROV dredging
• ROV inspection of substructure
• ROV wire cutting and recovery from seabed

• Installation of 2×800 m long outlet pipes for cooling water
• Positioning and installing of jackets for jetty.

• NDE awarded a maintenance contract at YLING site and jetty extension.
• Underwater maintenance work of the YLNG plant