SAT Diving for Spool & Riser installation, Touchdown Monitering, As-Lay Inspection 2023

WORK DESCRIPTION: ROV Pipelay touch-down monitoring,
Removal of test piles 2022

WORK DESCRIPTION:
The second campaign to remove installed test piles used for monitoring seabed conditions
Grab monitoring with ROV to prevent subsea object being damaged during sampling 2022

WORK DESCRIPTION: Grab monitoring with ROV to prevent subsea objects from being damaged during sampling.
Removal of Test piles. Vessel: Horizon Enabler. 2022

WORK DESCRIPTION:
Removal of installed test piles used for monitoring seabed conditions
Activities relating to the installation of pipeline 2019

WORK DESCRIPTION:
Activities relating to the installation of pipeline:
Offshore retrofit installation campaign, Globaltech I 2019

WORK DESCRIPTION:
Offshore retrofit installation campaign:
Offshore installation campaign, Deutsche Bucht 2019

WORK DESCRIPTION:
Offshore installation campaign:
• Project management and planning
• Installation of subsea components
Combined structural inspection and maintenance campaign 2018

WORK DESCRIPTION:
Combined structural inspection and maintenance campaign
Periodic subsea inspection and survey, Nordsee One 2018

WORK DESCRIPTION:
Periodic subsea inspection and survey
Subsea inspection and installation campaign 2017

WORK DESCRIPTION:
Subsea inspection and installation campaign
Subsea installation and inspection campaign 2016

WORK DESCRIPTION:
Subsea installation and inspection campaign for ABB
Combined structural inspection and maintenance campaign 2016

WORK DESCRIPTION:
Combined structural inspection and maintenance campaign